military

[알림판목록 I] [알림판목록 II] [글목록][이 전][다 음]
[ military ] in KIDS
글 쓴 이(By): terraic ()
날 짜 (Date): 1999년 3월 29일 월요일 오전 10시 03분 58초
제 목(Title): B-2기 미 공군 자료


Mission 

The B-2 Spirit is a multi-role bomber capable of delivering both conventional 
and nuclear
munitions. A dramatic leap forward in technology, the bomber represents a 
major milestone
in the U.S. bomber modernization program. The B-2 brings massive firepower to 
bear, in a
short time, anywhere on the globe through previously impenetrable defenses. 

Features 

Along with the B-52 and B-1B, the B-2 provides the penetrating flexibility and
effectiveness inherent in manned bombers. Its low-observable, or "stealth,"
characteristics give it the unique ability to penetrate an enemy's most 
sophisticated
defenses and threaten its most valued, and heavily defended, targets. Its 
capability to
penetrate air defenses and threaten effective retaliation provide a strong, 
effective
deterrent and combat force well into the 21st century. 

The revolutionary blending of low-observable technologies with high 
aerodynamic
efficiency and large payload gives the B-2 important advantages over existing 
bombers.
Its low-observability provides it greater freedom of action at high 
altitudes, thus
increasing its range and a better field of view for the aircraft's sensors. 
Its
unrefueled range is approximately 6,000 nautical miles (9,600 kilometers). 

The B-2's low observability is derived from a combination of reduced 
infrared, acoustic,
electromagnetic, visual and radar signatures. These signatures make it 
difficult for the
sophisticated defensive systems to detect, track and engage the B-2. Many 
aspects of the
low-observability process remain classified; however, the B-2's composite 
materials,
special coatings and flying-wing design all contribute to its "stealthiness." 

The B-2 has a crew of two pilots, a pilot in the left seat and mission 
commander in the
right, compared to the B-1B's crew of four and the B-52's crew of five. 

Background 

The first B-2 was publicly displayed on Nov. 22, 1988, when it was rolled out 
of its
hangar at Air Force Plant 42, Palmdale, Calif. Its first flight was July 17, 
1989. The
B-2 Combined Test Force, Air Force Flight Test Center, Edwards Air Force 
Base, Calif., is
responsible for flight testing the engineering, manufacturing and development 
aircraft as
they are produced. Three of the six developmental aircraft delivered at 
Edwards are
continuing flight testing. 

Whiteman AFB, Mo., is the B-2's only operational base. The first aircraft, 
Spirit of
Missouri, was delivered Dec. 17, 1993. Depot maintenance responsibility for 
the B-2 is
performed by Air Force contractor support and is managed at the Oklahoma City 
Air
Logistics Center at Tinker AFB, Okla. 

The prime contractor, responsible for overall system design and integration, 
is Northrop
Grumman's Military Aircraft Systems Division. Boeing Military Airplanes Co., 
Hughes Radar
Systems Group and General Electric Aircraft Engine Group are key members of 
the aircraft
contractor team. Another major contractor, responsible for aircrew training 
devices
(weapon system trainer and mission trainer) is Hughes Training Inc. (HTI) - 
Link
Division, formerly known as CAE - Link Flight Simulation Corp. Northrop 
Grumman and its
major subcontractor HTI, are responsible for developing and integrating all 
aircrew and
maintenance training programs. 

General Characteristics 

Primary function: Multi-role heavy bomber.
Prime Contractor: Northrop Grumman Corp.
Contractor Team: Boeing Military Airplanes Co., General Electric Aircraft 
Engine Group
and Hughes Training Inc., Link Division
Power Plant: Four General Electric F-118-GE-100 engines
Thrust: 17,300 pounds each engine
Length: 69 feet (20.9 meters)
Height: 17 feet (5.1 meters)
Wingspan: 172 feet (52.12 meters)
Speed: High subsonic
Ceiling: 50,000 feet (15,152 meters)
Takeoff Weight (Typical): 336,500 pounds (152,635 kilograms)
Range: Intercontinental, unrefueled
Armament: Conventional or nuclear weapons
Payload: 40,000 pounds (18,144 kilograms)
Crew: Two pilots
Unit cost: Approximately $1.3 billion
Date Deployed: December 1993
Inventory: Active force: 21 (planned operational aircraft); ANG: 0; Reserve: 


POINT OF CONTACT 

Air Combat Command, Office of Public Affairs; 115 Thompson Street, Suite 211; 
Langley
AFB, VA 23665-1987; DSN 574-5014 or (757) 764-5014. 

(Current as of March 1999) 

http://www.af.mil/news/factsheets/B_2_Spirit.html
 
------------------------ 글쓴이 ------------------------------
               金鍾淵 email : terraic@chollian.net  
                 011-391-8274 / 015-112-5604 
______________________________________________________________
[알림판목록 I] [알림판목록 II] [글 목록][이 전][다 음]
키 즈 는 열 린 사 람 들 의 모 임 입 니 다.